Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0920
E

Improper Use of Surge Suppressor for High Draw Appliance

West Grove, Pennsylvania Survey Completed on 06-25-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

A deficiency was identified when a surge suppressor was observed supplying electrical power to a coffee machine in the Break Room. This observation was made during a facility inspection and was confirmed in an interview with the Director of Maintenance. The use of a surge suppressor for a high draw appliance, such as a coffee machine, does not comply with the requirements for electrical equipment and power cord usage as outlined by NFPA standards. The facility failed to monitor and ensure proper use of surge suppressors in accordance with these regulations.

Plan Of Correction

1. The surge protector was removed on 6/25/25. 2. A facility-wide inspection was conducted to ensure no other surge protectors were inappropriately used on 7/1/25. 3. An audit will be conducted 1 x weekly for 1 month and bi-weekly for 2 months. 4. The audits will be reported to QAPI quarterly or until the deficient practice has been rectified. Education regarding surge protectors will be completed by 7/18 and provided at new employee orientation and annually thereafter. 5. The completion date is 8/24/25. K 0920

An unhandled error has occurred. Reload 🗙