Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
D

Failure to Maintain Smoke Barrier Integrity

Winter Haven, Florida Survey Completed on 02-11-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the continuity of smoke barriers in accordance with NFPA 101 standards. During a facility tour conducted on February 11, 2025, between 1:00 p.m. and 4:00 p.m., it was observed that there was an unsealed penetration in the smoke barrier above the smoke door by room 106. Additionally, there was an untested blowout patching in the smoke barrier above the ceiling in the same area. These deficiencies were identified through both observation and interview with the maintenance director. The maintenance director acknowledged the presence of the unsealed penetration and the untested blowout patching during the tour. He stated that he had already removed several blowout patches but admitted that this particular one had not been addressed, and the barrier was not sealed to the deck. These findings were reviewed with both the maintenance director and the administrator during the exit conference on the same day.

Plan Of Correction

1. Identified unsealed penetration & smoke barrier has been sealed. Identified untested blowout patching in the smoke barrier above the ceiling has been removed/repaired. 2. Maintenance Director/Designee completed observation of other facility smoke barriers to verify they are maintained in accordance with NFPA 101. 3. The administrator provided education for current facility Maintenance Department regarding smoke barrier maintenance. 4. Maintenance Director/Designee to complete monthly observation of smoke barriers to verify they are maintained in accordance with NFPA 101. Findings to be reviewed at the monthly QAPI Committee Meeting. Modifications as indicated based on findings.