Failure to Maintain Smoke Barrier Integrity per NFPA 101
Penalty
Summary
The facility failed to maintain fire and smoke barriers in accordance with NFPA 101-2012 Edition, Section 19.3.7.3 and Section 8.5.6.2. During a facility tour, surveyors observed multiple penetrations in smoke barriers that were improperly sealed with non-fire-rated, rubber-like materials. These penetrations included aluminum conduits and black pipes located in the interstitial spaces between the ceiling and drop ceiling above several 20-minute fire-rated double corridors leading into various halls, including the 100, 200, 300, and 400 Halls, as well as the Service Hall. Additionally, one 3-inch black pipe was found completely unsealed in the attic space above a fire-rated double corridor leading into the attic. The materials used to seal the other penetrations were not fire-rated and did not meet the requirements for restricting the transfer of smoke as specified by the referenced NFPA standards. The Regional Maintenance Director confirmed at the time of discovery that he was unsure of the type of material used to seal the pipes. These deficiencies were identified during direct observation and staff interviews, and the findings were confirmed by facility maintenance leadership. The report notes that these failures had the potential to affect all 39 residents in the facility, as the integrity of the smoke barriers was compromised by the use of improper sealing materials and the presence of unsealed penetrations.
Plan Of Correction
Tag: K 0372 Both the pipe and conduits between the ceiling and drop ceiling above the fire-rated double corridor leading into 100 hall, 200 hall, 300 hall, 400 hall, service hallway, and into the attic space were repaired with fire-rated caulk on or before 6/20/25. There was no other conduit or pipes found to have penetrations not properly sealed. Administrator educated maintenance director on NFPA 101 subdivision of building spaces - smoke barrier construction on 6/16/25. Maintenance director or designee will audit pipes and conduits for penetration monthly x 3 months. Audits will be submitted to the QAPI committee for review and recommendations. K 0372