Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
E

Unsealed Penetration in Smoke Barrier Wall

Pottstown, Pennsylvania Survey Completed on 08-06-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain smoke barrier walls free of unsealed penetrations, as required by NFPA 101 standards. During an observation on the second floor above the double doors near the Rehabilitation Department, an unsealed penetration was found around data wires. This deficiency was confirmed during an exit interview with the Administrator and Maintenance Director. The issue affected one of two floors in the building. No information regarding residents, their medical history, or their condition at the time of the deficiency was provided in the report.

Plan Of Correction

Unsealed penetration data wires around double doors by Rehabilitation office were sealed with fire stop compound. The maintenance director/designee will perform weekly safety rounds to ensure there are no ceiling penetrations that need to be sealed. Maintenance director/designee will report on the corrective action monthly x 6 months during QAPI.

An unhandled error has occurred. Reload 🗙