Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
E

Failure to Maintain Smoke Barrier Wall Integrity

Oxford, Pennsylvania Survey Completed on 01-28-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the smoke resistance of smoke barrier walls, which is a requirement for ensuring fire safety within the building. During an observation, it was noted that there were two unprotected penetrations in the basement Linen Storage Room wall, where two pipes had been removed. This deficiency was confirmed through an interview with the Maintenance Manager, who acknowledged the unprotected penetrations of the smoke barrier wall. This issue affected two out of the 14 smoke compartments within the component, compromising the smoke resistance of the barrier walls.

Plan Of Correction

The two penetrations of the basement Linen Storage Room will be corrected by the Maintenance Manager using an approved through penetration fire stop system. The Maintenance Manager or designee will conduct an audit of corridor walls weekly for one month, then bi-weekly for one month. Monthly fire walls inspections will be added to PM schedule to check for penetrations and caulking in place and ensure that the facility is maintaining the rating of the smoke barrier wall. Deficient findings will be reported to DES and QAPI meeting.

An unhandled error has occurred. Reload 🗙