Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
E

Unsealed Penetrations in Smoke Barrier Walls

Newtown, Pennsylvania Survey Completed on 12-09-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the fire resistance rating of smoke barrier partitions, which is a requirement for ensuring safety in the event of a fire. During observations conducted on December 9, 2024, it was noted that there were unsealed penetrations in the smoke barrier walls at several locations on the ground floor. Specifically, these penetrations were found above smoke doors by room W7 around data wires, above smoke doors by room W1 on the storage side around data wires, and above smoke doors by the Director of Nursing's Office around two 3-inch pipes. These observations were confirmed during an exit interview with the Facility Administrator and Maintenance Supervisor.

Plan Of Correction

The facility does and shall continue to ensure common fire walls are maintained free of unsealed penetrations. Pennswood Village Facilities will seal holes and penetrations using through penetration fire stop system C-AJ-8255 products in the following area. Repair shall be made 12/30/2024. The Maintenance Manager/Designee will continue to conduct inspections on a quarterly basis to identify any penetrations of common fire walls and seal them with the required sealant. Results of ongoing inspections will be reported to the Quality Assurance and Performance Improvement (QAPI) Team by the Maintenance Manager/Designee. Pennswood Village Maintenance Manager/Designee will oversee compliance.

An unhandled error has occurred. Reload 🗙