Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
E

Unsealed Penetrations in Smoke Barriers

Philadelphia, Pennsylvania Survey Completed on 01-22-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the fire resistance of smoke barriers, which is a requirement for ensuring safety in the event of a fire. During an observation on January 22, 2025, unsealed penetrations by data wires were found in the smoke barriers at two locations within the facility. The first unsealed penetration was observed on the second floor near resident room 257 at 10:02 a.m., and the second was on the first floor near resident room 172 at 10:19 a.m. This deficiency was confirmed during an exit interview with the Administrator and the Maintenance Director on the same day at 10:30 a.m.

Plan Of Correction

Maintenance director was in serviced on checking that all penetrations are properly sealed. Areas identified have been resolved by maintenance director by sealing penetrations around data wires with 3M Fire Barrier Sealant (CP 25WB+). All areas will be reviewed by maintenance director to assure that there are no open penetrations around data wires. Maintenance Director/Designee will monitor all areas to ensure that there are no open penetrations around data wires 3 times per week for 4 weeks and 1 time per month for 2 months. Results will be brought to QAPI and variances will be addressed.

An unhandled error has occurred. Reload 🗙