Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
E

Failure to Complete Required Sprinkler System Inspections

Cabot, Pennsylvania Survey Completed on 07-30-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to comply with sprinkler system maintenance regulations for two out of four systems, as identified during a document review and interview. Specifically, one of two required semi-annual supervisory switch inspections was not completed, and the annual trip test for the dry system was also not performed. These deficiencies were confirmed by the maintenance director during the survey, indicating that the necessary inspections had not been conducted at the time of review.

Plan Of Correction

Education will be provided to maintenance staff for schedule of annual trip test and semi-annual supervisory switch inspection. Annual inspection will be completed 8/14/25 and full flow trip dry system will be completed 8/15/25. Maintenance director or designee will audit compliance with dry system annual trip test and semi-annual supervisory switch inspection quarterly until substantial compliance is achieved. The results of these audits will be reviewed quarterly by the Quality Assurance and Quality Improvement committee for further analysis and recommendation.