Missing Documentation for Required Sprinkler System Inspections
Summary
Surveyors identified a deficiency related to the facility’s failure to maintain required documentation for its automatic sprinkler system. During document review and interview on April 30, 2026, at 10:50 a.m., the facility was unable to provide records showing that semi-annual inspections of valve supervisory switches had been completed, as required. At the same time, the facility also could not produce documentation of annual inspections for the sprinkler system control valves. The maintenance supervisor confirmed during the interview that the sprinkler system documentation for these required inspections was unavailable at the time of the survey. No residents or specific patient conditions were mentioned in the report, and the deficiency centered solely on missing inspection and maintenance records for the fire sprinkler system components.
Plan Of Correction
Completion Date: 05/29/2026 Status: APPROVED Date: 05/20/2026 Maintenance department was educated on the need for the sprinkler system to be inspected and tested at regular intervals that includes semi annual for valve supervisory switches and annual control valves. The semi annual inspection will be scheduled to be completed per NFPA-0100 25. The annual control valve inspection will be scheduled to be completed per NFPA-0100 25. Random audits will be completed by the Administrator and/or designee monthly for 6 months to assure that semi annual valve supervisory switched and annual control valve testing was completed. Audit results will be reviewed by the facility Quality Assurance Performance Improvement Committee to determine compliance or need for continuation of audits.
Penalty
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release May 27, 2026) and official state health department websites — never guesswork.
Trusted by long-term care providers and associations.



