Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
E

Failure to Maintain and Test Sprinkler System per NFPA 25

Battle Creek, Michigan Survey Completed on 05-08-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to comply with NFPA 25 requirements for the inspection, testing, and maintenance of its automatic sprinkler system. Specifically, records showed that the 2nd, 3rd, and 4th quarter sprinkler flow tests were not conducted or documented, as no test results were available at the time of the survey. Additionally, an observation in the therapy room revealed a sprinkler head dated 1967, indicating it had not been replaced or updated in over 50 years. These deficiencies were confirmed through record review and interview with the Facility Maintenance Director.

Plan Of Correction

K353 1. The Maintenance Director and/or designee will conduct a sprinkler flow test and replace the sprinkler head in the Therapy room. 2. The Administrator will review regulation K353 and provide education to the Maintenance team on the requirements. 3. The Maintenance Director and/or designee will ensure sprinkler system maintenance is scheduled for the remainder of 2025. The Maintenance Director and/or designee will ensure the Preventative Maintenance system flags for sprinkler system maintenance to ensure compliance. Results of sprinkler system testing will be brought to the Quality Assurance Performance Improvement meeting monthly for review. 4. The Administrator is responsible to attain and maintain compliance. Completion date for compliance will be 06.20.25.