Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0345
F

Incomplete Fire Alarm Sensitivity Testing Documentation

Holland, Michigan Survey Completed on 05-08-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that the fire alarm system was tested and maintained in accordance with NFPA 70 and NFPA 72 standards. During a record review, it was found that the fire alarm sensitivity testing report only included the range of values for smoke detectors tested, rather than providing the required individual values for all smoke detectors within the facility. This incomplete documentation was confirmed during an interview with the Maintenance Director at the time of the survey observation.

Plan Of Correction

The correct bi-annual fire alarm sensitivity report was obtained on 5-6-25. The report was dated 11-27-24 and contains the correct documentation showing sensitivity values for each device. A one-time audit was completed on all fire alarm documentation by the Maintenance Director on 5-7-25 to ensure all inspections contain the correct information. Education was provided to the Maintenance Director on 5-20-25 as to the requirements of the 2-year sensitivity testing report, ensuring that they show the correct values for each device. A monthly audit x3 will be completed by the Maintenance Director or designee to ensure all fire alarm documentation contains the correct information. Audit findings will be presented to the facility QAPI committee and will only be discontinued with substantial compliance and with approval of the facility QAPI. The Administrator is responsible for achieving and sustaining compliance.

An unhandled error has occurred. Reload 🗙