Failure to Perform and Document Annual Duct Detector Differential Testing
Penalty
Summary
Surveyors identified a deficiency related to the facility’s fire alarm system testing and maintenance, specifically the required annual Duct Detector Differential testing. During record review conducted between 11:30 AM and 3:00 PM, surveyors requested documentation demonstrating that this annual testing had been completed in accordance with NFPA 101 (2012 and 2021 editions), NFPA 70, and NFPA 72. The facility was unable to produce records showing that the Duct Detector Differential testing had been performed as required. In an interview conducted during the same time frame, the Director of Facilities acknowledged that the facility failed to provide documentation of the annual Duct Detector Differential testing. The deficiency was cited under NFPA 101 2012 (19.2.9.1, 7.9) and NFPA 101 2021 (19.2.9.1, 7.9), indicating noncompliance with the standards that require fire alarm detection systems, including duct detectors, to be tested and maintained annually. The report notes that this deficiency could affect all occupants of the facility in the event of a fire or other emergency.
Plan Of Correction
Fire Alarm System - Testing and Maintenance CFR(s): NFPA 101 Preparation and/or execution of this plan does not constitute admission or agreement by the provider that a deficiency exists. This response is also not to be construed as an admission of fault by the facility, its employees, agents or other individuals who draft or may be discussed in this response and plan of correction. This plan of correction is submitted as the facility's credible allegation of compliance and Soley because it is required Fire Alarm System - Testing and Maintenance K0345 1. On The facility a certified fire alarm vendor to perform annual duct detector differential testing. All required testing has now been completed and documented. 2. All residents and staff were considered at risk due to lack of documented testing. A facility-wide review of all fire alarm components was conducted on 3. The facility established a service agreement to ensure all fire alarm testing (including duct detectors) is completed annually per NFPA 72 and NFPA 101 requirements. A compliance calendar has been implemented with alerts for required inspections and testing. The Director of Facilities/designee has been re-educated on required testing intervals and documentation. 4. The Director of Facilities or designee will audit for 3 months all documentation for the annual testing and inspection of the duct detector pressure differential test. The Director of Facilities will present the findings of site inspections for 3 months at Quality Assurance Performance Improvement (QAPI) meetings to confirm inspections have taken place. During and at the conclusion of the three months, the QAPI committee will re-evaluate and initiate necessary action or extend the review period. The Administrator is responsible for confirming implementation and ongoing compliance with the components of the Plan of Correction, and resolving variances that may occur. The Administrator is responsible for confirming the status of this Plan of Correction is reviewed and discussed at QAPI meetings and action initiated if required Fire Alarm System - Testing and Maintenance CFR(s): NFPA 101 Preparation and/or execution of this plan does not constitute admission or agreement by the provider that a deficiency exists. This response is also not to be construed as an admission of fault by the facility, its employees, agents or other individuals who draft or may be discussed in this response and plan of correction. This plan of correction is submitted as the facility's credible allegation of compliance and Soley because it is required Fire Alarm System - Testing and Maintenance K0345 1. On The facility a certified fire alarm vendor to perform annual duct detector differential testing. All required testing has now been completed and documented. 2. All residents and staff were considered at risk due to lack of documented testing. A facility-wide review of all fire alarm components was conducted on. 3. The facility established a service agreement to ensure all fire alarm testing (including duct detectors) is completed annually per NFPA 72 and NFPA 101 requirements. A compliance calendar has been implemented with alerts for required inspections and testing. The Director of Facilities/designee has been re-educated on required testing intervals and documentation. 4. The Director of Facilities or designee will audit for 3 months all documentation for the annual testing and inspection of the duct detector pressure differential test. The Director of Facilities will present the findings of site inspections for 3 months at Quality Assurance Performance Improvement (QAPI) meetings to confirm inspections have taken place. During and at the conclusion of the three months, the QAPI committee will re-evaluate and initiate necessary action or extend the review period. The Administrator is responsible for confirming implementation and ongoing compliance with the components of the Plan of Correction. The Administrator is responsible for confirming the status of this Plan of Correction is reviewed and discussed at QAPI meetings and action initiated if required