Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$29 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0345
F

Failure to Perform and Document Annual Duct Detector Differential Testing

Boca Raton, Florida Survey Completed on 04-30-2026

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

Surveyors identified a deficiency related to the facility’s fire alarm system testing and maintenance, specifically the required annual Duct Detector Differential testing. During record review conducted between 11:30 AM and 3:00 PM, surveyors requested documentation demonstrating that this annual testing had been completed in accordance with NFPA 101 (2012 and 2021 editions), NFPA 70, and NFPA 72. The facility was unable to produce records showing that the Duct Detector Differential testing had been performed as required. In an interview conducted during the same time frame, the Director of Facilities acknowledged that the facility failed to provide documentation of the annual Duct Detector Differential testing. The deficiency was cited under NFPA 101 2012 (19.2.9.1, 7.9) and NFPA 101 2021 (19.2.9.1, 7.9), indicating noncompliance with the standards that require fire alarm detection systems, including duct detectors, to be tested and maintained annually. The report notes that this deficiency could affect all occupants of the facility in the event of a fire or other emergency.

Plan Of Correction

Fire Alarm System - Testing and Maintenance CFR(s): NFPA 101 Preparation and/or execution of this plan does not constitute admission or agreement by the provider that a deficiency exists. This response is also not to be construed as an admission of fault by the facility, its employees, agents or other individuals who draft or may be discussed in this response and plan of correction. This plan of correction is submitted as the facility's credible allegation of compliance and Soley because it is required Fire Alarm System - Testing and Maintenance K0345 1. On The facility a certified fire alarm vendor to perform annual duct detector differential testing. All required testing has now been completed and documented. 2. All residents and staff were considered at risk due to lack of documented testing. A facility-wide review of all fire alarm components was conducted on 3. The facility established a service agreement to ensure all fire alarm testing (including duct detectors) is completed annually per NFPA 72 and NFPA 101 requirements. A compliance calendar has been implemented with alerts for required inspections and testing. The Director of Facilities/designee has been re-educated on required testing intervals and documentation. 4. The Director of Facilities or designee will audit for 3 months all documentation for the annual testing and inspection of the duct detector pressure differential test. The Director of Facilities will present the findings of site inspections for 3 months at Quality Assurance Performance Improvement (QAPI) meetings to confirm inspections have taken place. During and at the conclusion of the three months, the QAPI committee will re-evaluate and initiate necessary action or extend the review period. The Administrator is responsible for confirming implementation and ongoing compliance with the components of the Plan of Correction, and resolving variances that may occur. The Administrator is responsible for confirming the status of this Plan of Correction is reviewed and discussed at QAPI meetings and action initiated if required Fire Alarm System - Testing and Maintenance CFR(s): NFPA 101 Preparation and/or execution of this plan does not constitute admission or agreement by the provider that a deficiency exists. This response is also not to be construed as an admission of fault by the facility, its employees, agents or other individuals who draft or may be discussed in this response and plan of correction. This plan of correction is submitted as the facility's credible allegation of compliance and Soley because it is required Fire Alarm System - Testing and Maintenance K0345 1. On The facility a certified fire alarm vendor to perform annual duct detector differential testing. All required testing has now been completed and documented. 2. All residents and staff were considered at risk due to lack of documented testing. A facility-wide review of all fire alarm components was conducted on. 3. The facility established a service agreement to ensure all fire alarm testing (including duct detectors) is completed annually per NFPA 72 and NFPA 101 requirements. A compliance calendar has been implemented with alerts for required inspections and testing. The Director of Facilities/designee has been re-educated on required testing intervals and documentation. 4. The Director of Facilities or designee will audit for 3 months all documentation for the annual testing and inspection of the duct detector pressure differential test. The Director of Facilities will present the findings of site inspections for 3 months at Quality Assurance Performance Improvement (QAPI) meetings to confirm inspections have taken place. During and at the conclusion of the three months, the QAPI committee will re-evaluate and initiate necessary action or extend the review period. The Administrator is responsible for confirming implementation and ongoing compliance with the components of the Plan of Correction. The Administrator is responsible for confirming the status of this Plan of Correction is reviewed and discussed at QAPI meetings and action initiated if required

Long-term care team reviewing survey readiness and plan of correction

We Help Long-Term Care Teams Stay Survey-Ready

We process and analyze inspection reports and plan of correction using AI to extract insights and trends so providers can improve care quality and stay ahead of compliance risks.

Discover our solutions:

An unhandled error has occurred. Reload 🗙