Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0345
F

Fire Alarm System Maintenance Deficiency

St. Clair Shores, Michigan Survey Completed on 04-15-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that the fire alarm system was tested and maintained in accordance with an approved program that complies with NFPA 70 and NFPA 72. During an observation, the fire alarm remote panel located in the vestibule to Physical Therapy (new) was found to be displaying incorrect date and time information, specifically showing '0506 on 06/03/2059.' This issue was confirmed by the facility Maintenance Director at the time of observation. This deficiency could potentially affect all 175 residents in the facility in the event of a fire situation, as the fire alarm system may not function as required due to improper maintenance or testing.

Plan Of Correction

K345- Fire Alarm System- Maintenance and Testing 1. The facility failed to ensure the fire alarm system was tested and maintained in accordance with an approved program complying with NFPA 70 and NFPA 72. a. The Fire alarm remote panel date and time in the vestibule to Physical Therapy is correct. 2. The Maintenance director and staff will be educated on the importance of rounding and ensuring the time and date on the fire alarm remote panels have the correct date and time. 3. To ensure compliance is maintained, the Maintenance Director/designee will complete a random audit 3x a week for 4 weeks. Findings will be reported to the QAPI committee. 4. The facility Administrator will be responsible for assuring substantial compliance is attained through this plan of correction by 5/13/2025 and for sustained compliance thereafter.

An unhandled error has occurred. Reload 🗙