Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0351
E

Improper Use of Sprinkler Pipe for Mechanical Support

Ishpeming, Michigan Survey Completed on 05-19-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

A deficiency was identified when, during an observation in the 300 wing mechanical room, a hot water pipe was found being supported and hanging from a sprinkler pipe. This setup was not in accordance with NFPA 13, the Standard for the Installation of Sprinkler Systems, which requires that sprinkler systems be installed as specified and not used to support other building systems. The Maintenance Director confirmed this finding at the time of discovery. No information regarding specific residents, their medical history, or their condition at the time of the deficiency was provided in the report.

Plan Of Correction

Element 1: Hot water pipe was supported and hanging from sprinkler pipe. Hot water pipe will be removed from sprinkler pipe and supported from ceiling. Element 2: All residents/visitors/staff of the 300 wing have the potential to be impacted by this deficient practice in the event of need for sprinkler use. Element 3: On 06/03/2025 the hanger was removed from the sprinkler pipe and the hot water pipe was secured directly to the ceiling. Element 4: Physical Plant Manager will be responsible for sustained compliance.