Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0351
F

Incomplete Sprinkler System Installation in Electrical Room

Bryn Mawr, Pennsylvania Survey Completed on 04-15-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to install required sprinkler system components, specifically in the Main electrical (switchgear) Room located in the basement. This deficiency was identified during an observation on April 15, 2025, at 11:25 a.m. The absence of an automatic sprinkler system in this area was confirmed during an exit interview with the Administrator, Maintenance Director, and Regional VP of Operations on the same day at 2:45 p.m. This oversight affects one of the three levels of the facility, indicating incomplete automatic sprinkler protection as per the requirements outlined in NFPA 101 and NFPA 13 standards.

Plan Of Correction

1) The facility contractor is submitting plans to the Plan Review Department for approval of modifications to the fire suppression system for approval. 2) The Maintenance Director and/or designee will inspect the Main Electrical Room once a suitable fire suppression system is installed. 3) To prevent the potential for reoccurrence, the Administrator will educate the Maintenance Director and/or designee on the importance of a suitable fire suppression system is installed. 4) To monitor and maintain ongoing compliance, the Administrator and/or designee will check the fire suppression system is in place as required monthly for 3 months. Findings will be reported to facility QAPI for continued review and recommendations.