Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
F

Sprinkler System Maintenance Deficiency Due to Missing Ceiling Tiles

Sturgis, Michigan Survey Completed on 05-19-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain and test the automatic sprinkler system in accordance with NFPA 25 requirements. During an observation, surveyors found missing ceiling tiles in the drop ceiling grid within the wheelchair storage room near the nurse station. This deficiency was confirmed through an interview with the Maintenance Director at the time of observation. The absence of ceiling tiles could interfere with the sprinkler system's heat collection process, as required by NFPA 25, 5.2.1. No information about specific residents, their medical history, or their condition at the time of the deficiency is provided in the report.

Plan Of Correction

The ceiling tiles in the wheelchair storage room have been installed. All other areas of the building have been inspected, and no other ceiling tiles are missing. Ceiling tiles will be inspected on a weekly basis by the maintenance department and documented in the preventative maintenance log. The Maintenance Director will monitor compliance by completing rounds weekly, observing for missing ceiling tiles.

An unhandled error has occurred. Reload 🗙