Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
D

Automatic Sprinkler System Deficiencies

Washington, Pennsylvania Survey Completed on 04-15-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the automatic sprinkler system, resulting in deficiencies in two of the 15 smoke compartments. During an observation on April 14, 2025, two specific issues were identified: a gap larger than 1/8 inch was found around two sprinkler heads with escutcheons in a storage room inside the Inventory Control room, and a ceiling tile track hangar wire was attached to a sprinkler branch line above the smoke doors near the 2 South Supervisor's office. These deficiencies were confirmed through an interview with the Assistant Facility Administrator and Maintenance Director on April 15, 2025.

Plan Of Correction

Large gap around two sprinkler pipes with escutcheons in the inventory control storage room. Ceiling hanger wire attached to sprinkler branch line above smoke door near 2 south supervisors office. Maintenance adjusted hanger in ceiling to raise the sprinkler head and escutcheon closer to the ceiling tile and replaced the ceiling tile. Maintenance removed hanger from sprinkler. Maintenance conducted audit of facility with no other issues with sprinklers or escutcheons. The maintenance department will be educated on Sprinkler system compliance. Audits will be completed by maintenance to ensure sprinkler system is in compliance, Weekly X4 weeks and monthly X 2. All audits will be reported to QAPI.