Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
D

Failure to Document Five-Year Sprinkler System Inspection

Hollywood, Florida Survey Completed on 04-08-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain their Automatic Fire Sprinkler System (AFSS) in accordance with NFPA 101 standards. During an inspection on April 8, 2025, it was observed that there was no documentation available for the required five-year internal backflow preventer inspection. This deficiency was identified during a record review conducted with the Maintenance Director, who acknowledged the findings. The lack of documentation for the inspection was discussed with the Maintenance Director during the exit conference on the same day.

Plan Of Correction

NFPA 101 ACTION(S) TAKEN TO CORRECT THE DEFICIENCY: The facility scheduled a 5-year sprinkler backflow on 4/16/2025 and completed on 4/17/2025. HOW OTHER RESIDENTS HAVING THE POTENTIAL TO BE AFFECTED BY THE SAME DEFICIENT PRACTICE WILL BE IDENTIFIED: A full audit was completed to identify all residents with potential to be affected by the deficient practice. The potential for harm was minimal. MEASURES PUT INTO PLACE TO ENSURE THE SAME DEFICIENT PRACTICE DOES NOT REOCCUR: The Maintenance Director or Designee will conduct an audit on an annual basis to ensure the 5-year sprinkler backflow is in compliance. HOW THE CORRECTIVE ACTION WILL BE MONITORED: The Maintenance Director will audit compliance with the 5-year sprinkler back annually for compliance. Findings will be brought to QAPI.

An unhandled error has occurred. Reload 🗙