Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
D

Deficiency in Sprinkler System Maintenance

Miami, Florida Survey Completed on 04-01-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its automatic sprinkler system in accordance with NFPA 101 standards. During a Life Safety Survey tour, it was observed that the Rehabilitation Standpipe Room lacked a posted list in the sprinkler cabinet. Additionally, there was no spare dry sprinkler available for the freezer, nor was there a means to restore service in case of a malfunction. These deficiencies were identified during an inspection conducted at 2:43 pm on April 1, 2025, with the Maintenance Director present. The absence of essential components and documentation in the sprinkler system indicates a lapse in the facility's adherence to the required safety protocols. The Maintenance Director acknowledged these findings during the staff interview, and the issues were also discussed with the Administrator during the exit conference. The report cites specific sections of NFPA 101 and NFPA 25 that were not met, highlighting the facility's failure to comply with established fire safety standards.

Plan Of Correction

This Plan of Correction does not constitute admission or agreement by Miami Shores Nursing & Rehabilitation Center of the truth of the facts alleged, or conclusions set forth in the statement of deficiencies. This Plan of Correction is prepared solely because it is required by State and Federal Laws. **K353 Sprinkler System Maintenance and Testing** **Identify patients that were at risk and what did:** When the surveyor identified the issue we contacted vendor, and they provided the list and the director of plant operations framed it and placed it in room adjacent to the cabinet. The Dry pipe has been delivered and placed in same location. **How will you identify other patients that are at risk?** When the surveyor identified the issue, we contacted vendor, and they provided the list and the director of plant operations framed it and placed it in the room adjacent to the cabinet. The Dry pipe has been delivered and placed in same location. **Measure put in place:** The Director of Plant Operations will check monthly to ensure that the box is supplied and nothing is missing. **How will you monitor?** The Director of Plant Operations will check monthly to ensure that the box is supplied and nothing is missing. Any Variances will be brought to the QAPI Committee. 5/1/25 This Plan of Correction does not constitute admission or agreement by Miami Shores Nursing & Rehabilitation Center of the truth of the facts alleged, or conclusions set forth in the statement of deficiencies. This Plan of Correction is prepared solely because it is required by State and Federal Laws. **K353 Sprinkler System Maintenance and Testing** **Identify patients that were at risk and what did:** When the surveyor identified the issue we contacted vendor, and they provided the list and the director of plant operations framed it and placed it in room adjacent to the cabinet. The Dry pipe has been delivered and placed in same location. **How will you identify other patients that are at risk?** When the surveyor identified the issue, we contacted vendor, and they provided the list and the director of plant operations framed it and placed it in the room adjacent to the cabinet. The Dry pipe has been delivered and placed in same location. **Measure put in place:** The Director of Plant Operations will check monthly to ensure that the box is supplied and nothing is missing. **How will you monitor?** The Director of Plant Operations will check monthly to ensure that the box is supplied and nothing is missing. Any Variances will be brought to the QAPI Committee.

An unhandled error has occurred. Reload 🗙