Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
F

Failure to Maintain and Inspect Sprinkler Systems

Broomall, Pennsylvania Survey Completed on 01-07-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain and inspect its sprinkler systems in accordance with NFPA 25 standards, affecting the entire facility. During a document review, it was found that the facility could not provide documentation for a 3-year dry system full flow test and a 5-year internal valve and pipe inspection. An exit interview with the Administrator and Maintenance Director confirmed the lack of documentation. Upon a subsequent onsite revisit, it was determined that although a 5-year internal valve and pipe inspection was conducted, the dry sprinkler system did not pass inspection due to pipes being partially full of foreign materials, necessitating an internal cleaning. The blockage in the dry sprinkler pipes was confirmed during an exit interview with the Administrator and Maintenance Director.

Plan Of Correction

Internal inspection and flushing of dry system will be completed by 4/18/25. TLW to be submitted to allow for additional time to accommodate the weather to be 50 degrees or above to avoid freezing.

An unhandled error has occurred. Reload 🗙