Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
E

Sprinkler System Maintenance Deficiencies

Shenandoah, Pennsylvania Survey Completed on 12-11-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the sprinkler system, which provides fire protection, in two instances affecting two of four floors. On December 11, 2024, at 10:19 a.m., an observation on the 1st floor in the Therapy Room revealed a missing ceiling tile near the windows. This deficiency was confirmed during an exit interview with the Facility Administrator and the Facilities Manager. Additionally, between 10:27 a.m. and 10:32 a.m., observations on the 3rd floor identified two issues: a sprinkler head in the Shower Room was not sealed into the escutcheon, creating a gap, and a gap was also found around the sprinkler escutcheon in the ceiling near the Bathing Room corridor. These sprinkler deficiencies were also confirmed during the exit interview.

Plan Of Correction

1. The missing ceiling tile in the therapy gym was replaced. The ceiling tiles around the escutcheon(s) located in the 3rd floor shower room and 3rd floor corridor outside the bathing room were corrected to eliminate the gap identified. 2. A one-time facility audit conducted to ensure no gaps were identified around other escutcheons in the facility. 3. Education to the Maintenance Director and Maintenance staff to ensure no gaps are present around any escutcheons in the facility. 4. A monthly audit will be completed for three months to ensure no gaps are present around the escutcheons in the facility. Results of audit(s) to be submitted to the QA Committee Meeting monthly.

An unhandled error has occurred. Reload 🗙