Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
E

Unsealed Penetration in Smoke Barrier

Warrington, Pennsylvania Survey Completed on 01-30-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain smoke barrier walls, which is a requirement for ensuring fire safety. During an observation on January 30, 2025, at 9:50 a.m., an unsealed penetration was found above the double doors leading from the loading dock into the laundry department. This deficiency was confirmed during an exit interview with the Administrator and Maintenance Director on the same day at 12:45 p.m. The unsealed penetration compromises the smoke barrier's integrity, which is essential for maintaining a 1/2-hour fire resistance rating as per NFPA 101 standards.

Plan Of Correction

Maintenance to seal penetration above double doors from loading dock into laundry department with an approved UL listed fire stop barrier system. Maintenance director or designee to conduct monthly inspections of penetrations. The Maintenance Director or designee will report monthly findings to Quality Assurance for a 90-day period.

An unhandled error has occurred. Reload 🗙