Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
F

Sprinkler System Maintenance Deficiencies

Canonsburg, Pennsylvania Survey Completed on 02-10-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the automatic sprinkler system in six instances, affecting the entire facility. During an observation and document review, it was found that the facility did not provide documentation for the three-year Full Flow Trip Test of the dry pipe sprinkler system. Additionally, there were multiple instances of missing ceiling tiles in various rooms, including the Laundry room, Staff Development/Medical records room, kitchen, A-Wing utility room, and a gap larger than 1/8 inch in a ceiling tile inside the C-Wing Electrical Room. These deficiencies were confirmed during an interview with the Facility Administrator and Maintenance Director.

Plan Of Correction

1. The Facility will schedule the three-year Full Flow Trip Test of the dry pipe sprinkler system. 2. The facility will replace the missing ceiling tiles in the laundry room, in the staff development/medical records room, in the kitchen and in the A-wing utility room. 3. The gaps in the ceiling tile in the C-Wing Utility closet greater than 1/8 inch will be repaired/replaced as needed. 4. The maintenance staff will be in-serviced on Sprinkler system Maintenance and Testing. 5. The Maintenance staff/designee will do facility rounds to ensure all ceilings tiles are intact and that there are no gaps that are greater than 1/8 inches and will report any concerns to the Quality Assurance Performance improvement committee. 6. The Safety Committee will review the repairs to ensure all corrections are made.