Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
E

Deficiencies in Sprinkler System Maintenance

Stroudsburg, Pennsylvania Survey Completed on 02-04-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its automatic sprinkler system, as evidenced by several deficiencies observed during a survey. On the second floor, ceiling tiles were missing in the Mechanical Room, and similar issues were noted in the first floor IT Server Room. Additionally, the attic-level dry sprinkler system was found to be non-functional at the time of the survey. The facility also lacked an automatic sprinkler system inspection report for the fourth quarter of 2024, and was overdue for the required five-year internal valve, internal piping, and sprinkler gauge recalibration or replacement. These deficiencies were confirmed during an exit interview with the Facility Administrator and the Facilities Manager.

Plan Of Correction

K-0353 Sprinkler Systems 1. Ceiling tiles were lacking within the second floor Mechanical Room and ceiling tiles within the first floor IT Server Room were repaired. Attic-level dry sprinkler system was repaired and placed in service. Quarterly Sprinkler inspection was completed 2/2025. Five-year, internal valve, internal piping, and sprinkler gauge recalibration/replacement was also completed. 2. Audit will be competed for areas of missing ceiling tiles weekly x 4 then monthly x2. Sprinkler reports will be monitored for missing inspection pieces. Findings will be reviewed in QAPI.