Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
E

Sprinkler System Maintenance Deficiencies

Pittsburgh, Pennsylvania Survey Completed on 12-17-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the automatic sprinkler system in six instances, affecting four of twenty-seven smoke compartments. On December 16, 2024, observations revealed deficiencies such as insulation supported by the sprinkler line in the 6300 attic and gaps greater than 1/8 inch in rooms #5328, #4116, and #4118. On December 17, 2024, further deficiencies were observed, including a gap greater than 1/8 inch in the track of the ceiling tile outside room 4321 and flexible insulated ductwork laying on a sprinkler line above the double doors next to room 4172. Interviews with the Unit Director of TCU, Facility Staff, and the Safety Manager confirmed these deficiencies.

Plan Of Correction

The insulation will be relocated off of the sprinkler pipe in the 6300 attic. The ceiling tile will be replaced in rooms 5328, 4116, 4118, and 4321. The insulated ductwork will be relocated off of the sprinkler pipe in room 4172. All of these resolutions will be reported to the hospital safety committee and included in the hospital quality assurance program. All sprinkler lines are monitored and will continue to be monitored annually as part of the "Annual Fire and Smoke barrier above the ceiling program." Ceiling tiles are monitored and will continue to be monitored during hazard surveillance rounds by a multi-disciplinary team including representatives from safety, infection control, facilities, and environmental services.

An unhandled error has occurred. Reload 🗙