Failure to properly assess and monitor PICC line
Summary
The facility failed to ensure appropriate assessments and monitoring were implemented for a resident with a PICC line who was receiving IV antibiotics for MRSA infection, Shiga toxin-producing E. coli, Pseudomonas infection, chronic osteomyelitis with draining sinus of the left ankle and foot, and non-pressure chronic ulcers of the left ankle, heel, and midfoot. The resident’s PICC line was observed in place with a transparent dressing, and staff interviews showed differing understanding of how often the line should be measured and when dressing changes should occur. The DON stated the PICC should be measured weekly with dressing changes and that the baseline measurement should come from hospital or insertion records, but she could not determine the baseline measurement from the available insertion documentation. The resident’s MAR included orders to measure the PICC catheter length every 7 days and to change the transparent dressing every 7 days, but the orders did not specify the expected measurement or what action to take if the measurement differed from baseline. Nursing documentation showed inconsistent PICC measurements over time, including a note of 3 cm, later documentation of 12 cm, and a later measurement of 8.1 cm, with no recorded measurements between the new PICC insertion and the later documentation. One note also reflected a dressing change that was completed because the kit arrived, without documentation that the dressing was compromised or that the PICC site was measured at that time. The record further showed that on one date the resident’s medication was held due to loss of IV access, and the provider and cardiovascular team were notified, but the note did not include a PICC measurement or physical assessment of the site. A consultation form later documented that the PICC was not flushing and was partially dislodged, and that the resident required replacement of the line. The documentation also showed that after the original right upper extremity PICC was removed and a new PICC was inserted, the MAR did not reflect that the prior PICC orders had been discontinued or updated to match the new line.
Penalty
Resources
Below are regulatory guidelines relevant to this citation:
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release October 8, 2026) and official state health department websites — never guesswork.
In your survey window? See what surveyors are citing.
The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.