Failure to Maintain AC Preventative Maintenance Schedule and Critical Component Testing
Summary
The facility failed to maintain a documented maintenance schedule for its two air conditioning (AC) units and did not include testing of water valves and pneumatic controls in its preventative maintenance program. During interviews, the Maintenance Supervisor (MS) reported that the facility had two AC units, with the front unit currently working and the back unit not working due to a belt change. The MS stated that the front unit had not been working approximately two months earlier. The MS explained that the only preventative maintenance performed on the AC units was a daily visual inspection, and that the facility did not keep any log or documentation of these daily checks. In a telephone interview, the AC technician stated that they had been called to the facility a few weeks earlier for AC issues and indicated that the facility’s AC units required monthly preventative maintenance, including changing filters, testing water valves, and testing pneumatic controls. The MS reported that the AC technician had previously informed them that the problem with the AC unit was related to water valves on the roof that needed to be exercised (opened and closed). Review of the facility’s Maintenance Service policy, revised December 2009, showed that the Maintenance Department was responsible for maintaining buildings, grounds, and equipment in a safe and operable manner, providing routinely scheduled maintenance service, and that the Maintenance Director was responsible for developing and maintaining a schedule of maintenance service and maintaining maintenance schedules. The failure to maintain such schedules and to include testing of water valves and pneumatic controls in preventative maintenance had the potential for residents in general not to have a comfortable environment while at the facility.
Penalty
Resources
Below are regulatory guidelines relevant to this citation:
Trusted data from CMS and state health departments
Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release August 26, 2026) and official state health department websites — never guesswork.
In your survey window? See what surveyors are citing.
The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.