Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$29 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
F0727
F

Failure to Maintain a Designated Full-Time DON

Glasgow, Montana Survey Completed on 01-29-2026

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to designate a full-time DON as required, leaving the position vacant for 37 days. During interviews, staff members B and C reported that the facility had been without a DON for a little over a month and that DON tasks were divided among the IDT during this period. An email from staff member A dated 9/8/25 showed an advertisement posting for the DON position and indicated that the IDT took over DON tasks after the previous DON left, but there was no documentation that the prior DON’s duties were specifically reassigned to an RN or multiple RNs. Another email from staff member A on 9/8/25 confirmed that the previous DON no longer worked at the facility, and a subsequent email dated 10/16/25 documented that staff member B started as the new DON on that date, confirming the facility was without a designated DON from 9/8/25 through 10/16/25. No residents or specific patient conditions were mentioned in the report, and the deficiency centers solely on the lack of a designated full-time DON and the absence of documented reassignment of DON responsibilities to an RN during the vacancy period.

Long-term care team reviewing survey readiness and plan of correction

We Help Long-Term Care Teams Stay Survey-Ready

We process and analyze inspection reports and plan of correction using AI to extract insights and trends so providers can improve care quality and stay ahead of compliance risks.

Discover our solutions:

An unhandled error has occurred. Reload 🗙