Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Missing Emergency Generator Testing Documentation

Lititz, Pennsylvania Survey Completed on 07-01-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to provide documentation of required annual and three-year testing for the emergency generator that serves the entire facility. During a document review, it was found that records for the annual 90-minute load bank test and the three-year 4-hour load bank test were missing. These tests are mandated to ensure the generator and associated equipment can supply power within the required timeframe and are maintained according to NFPA standards. At the time of the exit conference, both the Director of Nursing and the Director of Maintenance confirmed that the facility was unable to supply the necessary test results for the emergency generator. The deficiency was identified solely through document review and staff interview, with no mention of specific residents or patient conditions related to the deficiency.

Plan Of Correction

1. The facility is unable to retroactively perform this testing. 2. Testing will be completed for the annual, 90-minute load bank and the 3-year, 4-hour load bank. 3. The Environmental Services Director was re-educated on the requirements of K0918. 4. The NHA or designee will complete an annual audit of the annual testing yearly in August. The results will be submitted to the QAPI Committee for review and analysis of the need for ongoing monitoring.