Failure to Perform and Document Annual Main and Feeder Breaker Testing
Penalty
Summary
The deficiency involves the facility’s failure to perform and document required annual maintenance and testing of the main and feeder circuit breakers in accordance with NFPA 99 and manufacturer recommendations. During a record review conducted between 11:30 AM and 3:00 PM, surveyors requested documentation of the annual main and feeder breaker exercise. The facility was unable to provide records demonstrating that this testing and exercising had been completed as required. In interviews conducted during the same time frame, the Director of Facilities acknowledged that the facility did not have documentation showing that the annual main and feeder breaker exercise was performed according to manufacturer recommendations. The report notes that this failure to comply with NFPA 99 (2012 and 2021 editions, Sections 6.4.4 and 6.5.4) could affect all occupants of the facility in the event of a fire or other emergency, and that written records of maintenance and testing are required to be maintained and readily available.
Plan Of Correction
Electrical Systems - Essential Electric System CFR(s): NFPA 101 Preparation and/or execution of this plan does not constitute admission or agreement by the provider that a deficiency exists. This response is also not to be construed as an admission of fault by the facility, its employees, agents or other individuals who draft or may be discussed in this response and plan of correction. This plan of correction is submitted as the facility's credible allegation of compliance and Soley because it is required Electrical Systems - Essential Electric System Maintenance and Testing K0918 1. On A licensed electrical contractor performed the annual main and feeder breaker testing/exercising in accordance with manufacturer recommendations. Documentation has been completed and is maintained on-site. 2. All residents were considered at risk due to lack of documented testing. A full review of the essential electrical system was conducted on 3. A preventative maintenance program has been implemented to ensure that annual breaker testing is completed per NFPA 99 (2012). The facility has incorporated electrical system testing into its environmental compliance tracking system. The Director of Facilities/designee received re-education on NFPA requirements. 4. The Director of Facilities will audit electrical system maintenance logs quarterly for 12 months. Inspections have taken place. During and at the conclusion of the three months, the QAPI committee will re-evaluate and initiate necessary action or extend the review period. The Administrator is responsible for confirming implementation and ongoing compliance with the components of the Plan of Correction, and resolving variances that may occur. The Administrator is responsible for confirming the status of this Plan of Correction is reviewed and discussed at QAPI meetings and action initiated if required. Electrical Systems - Essential Electric System CFR(s): NFPA 101 Preparation and/or execution of this plan does not constitute admission or agreement by the provider that a deficiency exists. This response is also not to be construed as an admission of fault by the facility, its employees, agents or other individuals who draft or may be discussed in this response and plan of correction. This plan of correction is submitted as the facility's credible allegation of compliance and Soley because it is required Electrical Systems - Essential Electric System Maintenance and Testing K0918 1. On A licensed electrical contractor performed the annual main and feeder breaker testing/exercising in accordance with manufacturer recommendations. Documentation has been completed and is maintained on-site. 2. All residents were considered at risk due to lack of documented testing. A full review of the essential electrical system was conducted on . 3. A preventative maintenance program has been implemented to ensure that annual breaker testing is completed per NFPA 99 (2012). The facility has incorporated electrical system testing into its environmental compliance tracking system. The Director of Facilities/designee received re-education on NFPA requirements. 4. The Director of Facilities will audit electrical system maintenance logs quarterly for 12 months. Inspections have taken place. During and at the conclusion of the three months, the QAPI committee will re-evaluate and initiate necessary action or extend the review period. The Administrator is responsible for confirming implementation and ongoing compliance with the components of the Plan of Correction, , and resolving variances that may occur. The Administrator is responsible for confirming the status of this Plan of Correction is reviewed and discussed at QAPI meetings and action initiated if required.
