Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918

Sprinkler Head Installed Too Close to Light Fixture

Bay City, Michigan Survey Completed on 06-24-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

Surveyors observed that the facility failed to provide a sprinkler system installed in accordance with NFPA 13 requirements. Specifically, during an inspection, it was found that the sprinkler head located in the main lobby near the front egress door was positioned too close to a light fixture. This proximity was determined to be within a few inches, which does not comply with NFPA 13, 8.3.2.5, Table 8.3.2.5(c), as it could alter the water flow pattern and prevent proper sprinkler protection. These findings were confirmed through interviews with the Director of Facilities and the Maintenance & Environmental Services Director at the time of observation.

Plan Of Correction

Element 2: An audit of the facility determined that 3 additional light fixtures are located too close to the sprinkler heads. Element 3: Electrician is scheduled to move overhead lights to be completed by 7/24/2025. Element 4: EVS Director or designee will audit sprinkler heads weekly to ensure that they are not blocked and provide proper sprinkler protection. Results will be brought to weekly QA for review and recommendations. EVS Director is responsible for compliance.