Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Failure to Maintain Required Annual Generator Maintenance Documentation

Muskegon, Michigan Survey Completed on 03-26-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its emergency generator system in accordance with NFPA 110, NFPA 99, NFPA 111, and NFPA 70 standards. During a record review conducted on March 26, 2025, it was found that the facility did not provide the required annual generator preventative maintenance report. The last available report was dated 3/20/24, indicating that the annual maintenance had not been documented for the current year. This deficiency was confirmed through an interview with the facility Maintenance Director at the time of the record review. The absence of the current annual preventative maintenance report means the facility could not demonstrate compliance with required generator maintenance protocols, which are essential for ensuring the emergency power system's reliability in the event of a main utility power loss.

Plan Of Correction

K918 1. No residents were harmed as a result of this deficient practice. 2. The annual generator preventative maintenance and testing has been completed on 4/3/2025. 3. The QAPI Committee has directed the Director of Plant Operations/designee to perform weekly generator load tests as scheduled and submit the results of those tests to QAPI. The Administrator is responsible for ensuring that substantial compliance is attained through the Plan of Correction and is maintained thereafter. The results will be provided to the QAPI Committee for further follow-up and review.