Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0521
F

Failure to Maintain HVAC Equipment Inspection

Bryn Mawr, Pennsylvania Survey Completed on 04-15-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the inspection of its Heating, Ventilating, and Air Conditioning (HVAC) equipment at the required intervals, affecting the entire facility. During a document review on April 15, 2025, it was discovered that a fire damper inspection report dated May 9, 2022, identified 73 dampers as deficient due to inaccessibility or damage. At the time of the survey, there was no evidence available to confirm that these deficiencies had been repaired. This finding was confirmed during an exit interview with the Administrator, Maintenance Director, and Regional VP of Operations.

Plan Of Correction

1) The facility vendor is in the process of identifying, repairing, and determining if the dampers are all necessary and if necessary to make modifications, will contact the Plan Review Department for approval of modifications to the fire suppression system. 2) The Maintenance Director and/or designee reviewed and confirmed the fire dampers are operable. 3) To prevent the potential for reoccurrence, the Administrator and/or designee educated the Maintenance Director and/or designee on the importance of ensuring fire dampers are inspected and operable. 4) To monitor and maintain ongoing compliance, the Administrator and/or designee ensure fire dampers remain operable monthly for 3 months. Findings will be reported to facility QAPI for continued review and recommendations.

An unhandled error has occurred. Reload 🗙