Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0521
E

Improper Venting of Portable Air Conditioning Unit

West Chester, Pennsylvania Survey Completed on 08-05-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

A deficiency was identified when, during an observation, a portable air conditioning unit was found in a large common area near the Nurses' Station on one of four floors. The unit was vented directly into the interstitial space of the ceiling rather than being vented to the outside, as required. This was confirmed during an interview with the Administrator, Regional Director, Regional Maintenance Director, and the Environmental Services Director. The facility did not maintain the air conditioning system in accordance with NFPA 101 and the manufacturer's specifications.

Plan Of Correction

The facility failed to maintain air conditioning systems on one of four floors. No residents were affected. All residents have the potential to be affected. The portable air conditioning unit, located in a large common area near the Nurses' Station, was removed so it is not vented directly into the interstitial space of the ceiling. The expected date for HVAC repair is September 30th, 2025, with the portable air conditioners removed before October 31st, 2025. An audit was completed by the Maintenance Director to ensure that no portable air conditioning units were vented directly into the interstitial space of the ceiling, with no concerns found and compliance confirmed. The Director of Maintenance and maintenance staff were educated by the Administrator on the requirement. The Maintenance Director/Designee will conduct one weekly audit of the portable air conditioner for four weeks, then monthly for two months. Results of audits will be reviewed at the Quarterly Quality Assurance and Improvement Committee Meeting over the duration of the audit process. Based on the results of the audits, a decision will be made regarding the need for continued submission and reporting.

An unhandled error has occurred. Reload 🗙