Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0321
D

Deficiency in Smoke-Tight Integrity of Boiler Room Doors

Chambersburg, Pennsylvania Survey Completed on 04-16-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the smoke-tight integrity of hazardous area doors in one of six smoke compartments. During an observation on April 16, 2025, at 11:55 AM, it was noted that there was a gap greater than 1/2-inch between the double doors of the Boiler Room due to a removed astragal. This deficiency was confirmed during an interview with the Assistant Director of Nursing and the Maintenance Director at the exit conference on the same day at 1:45 PM.

Plan Of Correction

1 and 2. Maintenance Director installed astragal between the double doors in the boiler room. 3. Maintenance department will be educated on the standards of ensuring the facility's corridor doors do not have a gap greater than 1/2in. and to not remove astragal. 4. Maintenance or facility designee will audit the facilities corridor doors weekly x2 for 2 months then quarterly throughout the year and results of the audit will be reported to the QA Committee.

An unhandled error has occurred. Reload 🗙