Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
D

Failure to Document Monthly Generator Conductance Test

Hollywood, Florida Survey Completed on 04-08-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain and test their Essential Electrical System (EES) in accordance with NFPA 99 standards. During a record review conducted on April 8, 2025, between 10:00 AM and 1:30 PM, it was found that there was no documentation available for the monthly generator conductance test. This deficiency was identified for 1 of 1 monthly generator conductance test, indicating a lapse in the required maintenance and testing procedures. The Maintenance Director was present during the record review and acknowledged the findings. The absence of documentation for the generator conductance test suggests that the facility did not perform or properly record the necessary monthly test to ensure the generator's capability to supply service within the required 10 seconds. This oversight was discussed with the Maintenance Director during the exit conference on the same day.

Plan Of Correction

CFR(s) NFPA 110, 99 ACTION(S) TAKEN TO CORRECT THE DEFICIENCY: Maintenance Director conducted a test on 4/8/2025, 4/16/2025, & 4/21/2025 to ensure the battery conductance test is at the correct voltage and by IPS TAW Generator Company on 4/21/2025. HOW OTHER RESIDENTS HAVING THE POTENTIAL TO BE AFFECTED BY THE SAME DEFICIENT PRACTICE WILL BE IDENTIFIED: The facility conduct a full house audit to identify all residents with the potential to be affected. The potential for harm is minimum. MEASURES PUT INTO PLACE TO ENSURE THE SAME DEFICIENT PRACTICE DOES NOT RECUR: The Maintenance Director will complete the Generator Conductance test on a monthly basis. Findings and the conductance test log will be brought to QAPI for 6 months and then annually thereafter. HOW THE CORRECTIVE ACTION WILL BE MONITORED: All findings will be brought to QAPI for six months and Annually thereafter.