Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
D

Failure to Document Essential Electrical System Maintenance

Palm Beach Gardens, Florida Survey Completed on 04-15-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain and test their essential electrical system in accordance with NFPA standards. During a record review conducted on April 15, 2025, between 10:00 AM and 2:00 PM, it was discovered that there was no documentation available for the performance of the main and feeder circuit breaker exercise. Additionally, there was no documentation provided for the generator's annual fuel quality test. These deficiencies were identified during a review with the Director of Continuum and the Maintenance Supervisor. The Director of Continuum and the Maintenance Supervisor acknowledged the findings during an interview conducted concurrently with the record review. The lack of documentation for these critical maintenance activities indicates a failure to adhere to the required standards for maintaining the essential electrical system, which is crucial for ensuring the safety and reliability of power in the facility. The findings were reviewed with the Director of Continuum and the Maintenance Supervisor at the exit meeting on the same day.

An unhandled error has occurred. Reload 🗙