Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Failure to Maintain and Test Generator System

Lansdale, Pennsylvania Survey Completed on 04-07-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain and test its generator system in accordance with the required standards, affecting the entire facility. During a document review, it was found that the facility could not provide documentation for specific tests over the past twelve months. These missing documents included a natural gas reliability letter and records of monthly testing of battery specific gravity or battery conductance. The deficiency was confirmed during an exit interview with the Administrator and the Maintenance Director. The lack of documentation indicates that the facility did not adhere to the necessary maintenance and testing protocols for its essential electrical systems, as outlined by NFPA standards. This oversight could potentially impact the facility's ability to ensure a reliable power supply in emergency situations.

Plan Of Correction

Maintenance Director has contacted the facility's natural gas company to obtain a copy of the Natural Gas Reliability Letter. Maintenance Director and/or designee initiated monthly testing of battery specific gravity or battery conductance to ensure the generator is properly maintained. Maintenance Director will present the Natural Gas Reliability Letter and monthly testing of the generator battery to Quality Council for review to ensure compliance.

An unhandled error has occurred. Reload 🗙