Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Failure to Perform Required Generator Load Bank Test

Mechanicsburg, Pennsylvania Survey Completed on 01-23-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its emergency generator system as required by NFPA standards. Specifically, the facility did not perform the mandatory 3-year, 4-hour load bank test on the generator, which is crucial for ensuring the generator's capability to supply emergency power within the required 10 seconds. This deficiency was identified during a document review and interview conducted on January 23, 2025, between 9:15 AM and 10:30 AM. The Director of Maintenance confirmed during an interview that the load bank test had not been performed. This oversight indicates a lapse in the facility's adherence to the maintenance and testing schedule outlined in NFPA 110, which mandates regular inspections and testing to ensure the reliability of emergency power systems. The failure to conduct this test could potentially compromise the facility's ability to provide essential power during emergencies.

Plan Of Correction

1. Facility has contracted with an outside vendor to complete the 4 hour load bank test, to be completed by Compliance date. 2. Maintenance Director or Designee will ensure the generator load bank scheduling will be reviewed yearly for documentation of the 3 year, 4-hour load bank test on the generator was performed as required. 3. Maintenance Director will report findings to the QAPI committee.

An unhandled error has occurred. Reload 🗙