Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0521
C

Failure to Document Fire Damper Maintenance

Pottsville, Pennsylvania Survey Completed on 12-18-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility was found deficient in maintaining proper documentation for the 4-year fire damper maintenance and exercise, as required by NFPA 101 standards for HVAC systems. During a document review conducted on December 18, 2024, between 9:15 AM and 11:00 AM, it was revealed that the facility failed to provide evidence that the necessary fire damper maintenance and exercise had been performed. This deficiency was confirmed during an exit conference with the Administrator and Director of Maintenance, who acknowledged the lack of documentation for the required maintenance.

Plan Of Correction

The facility to complete a 4 year fire damper HVAC inspection, by the facility HVAC external service provider. This inspection is scheduled for 1/15/2025. The vendor will draft a report, including the fire damper and fusible link status. The facility maintenance staff will audit annually to ensure the fire damper documentation is available in the life safety survey book for reference. The facility maintenance staff will monitor for the next scheduled inspection, anticipated on or before, January 2029. Findings from the inspection to be reported to QAPI for 3 months.

An unhandled error has occurred. Reload 🗙