Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0911
E

Electrical Wiring Protection Deficiency

North Wales, Pennsylvania Survey Completed on 02-10-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the protection of electrical wiring, which affected two of the four levels. During an observation on February 10, 2025, at 12:00 p.m., it was noted that a junction box in the basement chiller room ceiling was missing its protective cover, leaving the inner wiring exposed. Additionally, at 12:05 p.m. on the same day, a damaged duplex receptacle was observed on the third floor in the C/D Kitchenette, also exposing the inner wiring. These deficiencies were confirmed during an exit interview with the Administrator and Maintenance Director at 1:45 p.m. on February 10, 2025.

Plan Of Correction

The junction box in the basement chiller room ceiling was repaired. The duplex receptacle on the third floor C/D kitchenette was replaced. All electrical panels and wiring will be inspected and repairs made as needed. Maintenance will be in-serviced on electrical requirements in accordance with NFPA 99. Random weekly audit of electrical panels and receptacles will be conducted X3 weeks and findings reported to QAPI.