Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0911
E

Electrical Panel Blocked by Cart in Nurse Station Supply Closet

Philadelphia, Pennsylvania Survey Completed on 12-22-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

During an observation on the second floor of the facility, it was found that an electrical panel located inside the nurse station supply closet was blocked by a large cart. This observation was made on December 22, 2025, at 12:25 p.m. The presence of the cart obstructed access to the electrical panel, which is a violation of NFPA 70 2011 Section 110.26, requiring electrical panels to be accessible. The deficiency was confirmed during an exit conference with the Administrator and Maintenance Director later that day. No information regarding residents or their medical conditions was provided in relation to this deficiency.

Plan Of Correction

The obstructing cart was removed immediately, freeing the 2nd floor electrical panel of blockage. The maintenance director will re-educate all staff on maintaining clear access to all electrical panels. The maintenance director or designated designee will perform weekly audits for 4 weeks and then monthly audits for 2 months to ensure the facility is maintaining clear access to all electrical panels. Date of completion: 2/16/2026

An unhandled error has occurred. Reload 🗙