Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0321
E

Fire Resistance Deficiencies in Hazardous Areas

Lafayette Hill, Pennsylvania Survey Completed on 12-17-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the fire resistance rating of hazardous areas in sprinklered locations, affecting two of four levels. On the third floor, an unsealed penetration around a copper pipe was observed in the resident storage room D3091, and the electrical transformer room door lacked a self-closer. Additionally, on the second floor, combustible boxes were found laying atop an electrical transformer in the kitchen dry storage area. These deficiencies were confirmed during an exit interview with the Administrator and Maintenance Director.

Plan Of Correction

The facility should maintain the fire resistance rating of hazardous areas in sprinklered locations in all levels of facility. Per fire safety guidelines, fire caulk: 3M Fire Barrier Sealant CP 25WB+ was installed on the third-floor South resident storage room D3091 for unsealed penetration around copper pipe. The second-floor electrical transformer room door self-closer has been installed. The combustible boxes laying on top of electrical transformer in the second-floor kitchen dry storage have been removed. Staff education has been provided to ensure compliance. Audits will be conducted once a week for 4 weeks, bi-weekly for a month to ensure compliance. Staff education completed on 12-30-2024. The Facilities Director or designee will bring such audits to the QA meeting monthly x3 in order for the QA team to verify compliance.

An unhandled error has occurred. Reload 🗙