Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Deficiency in Emergency Generator Maintenance and Testing

Gettysburg, Pennsylvania Survey Completed on 02-04-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to meet the requirements for maintenance and testing of its emergency generator system, which serves the entire component. During a document review and interview process, it was discovered that the facility did not have documentation verifying that the quality of diesel fuel for the emergency generator had been inspected within the previous twelve months. This was confirmed during an exit conference with the Administrator and Maintenance Director, who acknowledged the lack of verification for diesel fuel quality testing. Additionally, the facility was unable to provide documentation for critical tests of the emergency generator. Specifically, there was no record of an annual 90-minute load bank test or a 3-year, 4-hour load test being performed. These deficiencies were confirmed during the exit conference, indicating a failure to adhere to the required maintenance and testing protocols for the emergency power system as outlined by NFPA standards.

Plan Of Correction

Diesel fuel for the generator will be inspected. A 90-minute load bank test will be completed as well as a 4 hour load test. Maintenance staff will be educated on the necessary inspections needed for the emergency generator. A semi annual audit will be completed to ensure that the necessary tests for the emergency generator have occurred. Audit results will be reported to QAPI.