Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Generator Documentation Deficiency

Cranberry Township, Pennsylvania Survey Completed on 01-29-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to meet the electrical system requirements for its generator, as evidenced by the absence of necessary documentation. During a document review on January 29, 2025, it was found that the facility could not provide records for the monthly battery-specific gravity or conductance test. Additionally, the facility lacked documentation for the three-year, four-hour load test, which is a critical component of ensuring the generator's reliability and compliance with NFPA standards. An interview with the maintenance supervisor on the same day confirmed that the required documentation was unavailable at the time of the survey. This deficiency indicates a lapse in the facility's maintenance and testing protocols for its essential electrical systems, which are crucial for ensuring the safety and functionality of the generator in emergency situations.

Plan Of Correction

4-hour full-load Generator run was completed on 11/3/2024. This was in response to a power outage that lasted 16 hours. The Nursing home administrator educated the maintenance director on ensuring the Generator testing to be completed timely. The NHA will monitor system compliance monthly. Results will be reviewed at the QAPI meeting. The generator at Cranberry Place is a battery specific gravity. The maintenance department was educated on where the battery read out is and record it as per regulation. The testing was completed until August 2024, then was missed. The battery specific gravity test has been recorded. Audits will be weekly for 4 weeks. Results will be reviewed at QAPI for further recommendations.

An unhandled error has occurred. Reload 🗙