Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Failure to Conduct and Document Emergency Generator Inspections

Pottstown, Pennsylvania Survey Completed on 12-09-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to conduct and document the necessary inspections and tests of the emergency generator, which is crucial for the entire component's operation. During a review of documentation and an observation conducted on October 8, 2024, it was found that the facility did not perform the required weekly visual inspections, nor did they record the battery voltage weekly. Additionally, the monthly load test and operation of the transfer switch were not conducted, and the annual fuel quality test was not performed. Furthermore, the facility did not complete the required 3-year, 4-hour load bank test. An interview with the Director of Maintenance confirmed that the facility could not provide verification that these essential generator inspections and tests had been performed. This lack of documentation and testing indicates a failure to comply with the standards set forth by NFPA 101 and related guidelines, which are critical for ensuring the reliability of the emergency power system in the event of a power failure.

Plan Of Correction

1. Facility is unable to retroactively conduct inspections and tests of the emergency generator. 2. GenServ-DynaTech will be contacted to complete the following required inspections before 01/06/25. Tests of the emergency generator will be completed with corresponding documentation kept on file: a. Weekly visual inspection b. Weekly recording of the battery voltage c. Monthly load test and operation of the transfer switch d. Annual fuel quality test e. 3-year, 4-hour load bank 3. Maintenance Director will complete audits. Maintenance Director and Maintenance staff will be educated on and complete the required weekly, monthly, annual, and tri-annual inspection, as required by regulation. 4. NHA or Designee will complete monthly audits of the Life Safety Book to ensure that inspections and tests are being completed weekly, monthly, annually, and tri-annually per regulation. Audits will be done quarterly once substantial compliance is achieved.