Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0911
E

Electrical Panel Latch Deficiency

Philadelphia, Pennsylvania Survey Completed on 01-30-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the protection of electrical wiring, specifically affecting one of the three floors. During an observation on January 30, 2025, at 10:30 a.m., it was noted that the electrical panel labeled MR1 in the Mechanical Room on the ground floor had a missing latch. This missing latch prevented the cover of the electrical panel from closing properly. The deficiency was confirmed during an exit interview with the Administrator and the Maintenance Director at 11:30 a.m. on the same day.

Plan Of Correction

Step 1 Latch placed on the electrical panel labeled MR1 in the ground floor Mechanical Room. Step 2 A facility-wide audit of all electrical panels was completed to ensure that all panels have covers that positively close. Step 3 The maintenance team was educated on the requirement for electrical panels to have covers that are positively closed. Step 4 The maintenance director/ designee will complete the audit monthly x 4 and findings will be reviewed during QAPI meeting.