Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Generator Documentation Deficiency

Erie, Pennsylvania Survey Completed on 02-06-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to meet the electrical system requirements for its generator, as evidenced by the absence of necessary documentation. During a document review and interview conducted on February 6, 2025, it was revealed that the facility could not provide annual generator documentation for a 90-minute load bank test and a fuel quality test. This deficiency was confirmed during an interview with the maintenance supervisor, who acknowledged the unavailability of the required documentation at the time of the survey. The generator and associated equipment are required to supply service within 10 seconds, and maintenance and testing must be performed in accordance with NFPA 110. The generator sets should be inspected weekly, exercised under load for 30 minutes 12 times a year, and exercised once every 36 months for 4 continuous hours. Additionally, written records of maintenance and testing must be maintained and readily available. The facility's failure to provide documentation for the 90-minute load bank test and fuel quality test indicates non-compliance with these requirements.

Plan Of Correction

The maintenance director provided supporting documentation to the inspector on 02/10/2025. The maintenance director contacted Cleveland Brothers and obtained copies of the documentation for the fuel quality testing completed. Documentation was added to the survey readiness binder. The life safety checklist will be reviewed in the quarterly QAPI meeting.

An unhandled error has occurred. Reload 🗙