Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0541
E

Failure to Maintain Fire Resistance of Linen Chutes

Stillwater, Pennsylvania Survey Completed on 12-23-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the fire resistance rating of linen chutes and discharge rooms, affecting two of four levels. During an observation on December 23, 2024, between 11:45 a.m. and 12:05 p.m., it was noted that the linen chute doors on the third and second floors of the South Wing did not close and latch properly when tested. This deficiency was confirmed during an exit interview with the Administrator and Maintenance Director on the same day at 12:15 p.m.

Plan Of Correction

1. On 1/3/2025 the Maintenance team replaced the existing hardware on the 2nd and 3rd floor South Wing linen chutes. 2. On 12/23/24 the Maintenance Director inspected the linen chutes on the other units and verified the proper functionality. 3. On 12/30/2024 the NHA educated the maintenance team on maintaining the fire resistance rating of the linen chutes in accordance with NFPA 101 requirements. 4. The Maintenance Director/designee will conduct weekly audits for 4 weeks to verify positive latching and the proper functionality of the linen chute doors. Results of the audits will be reviewed at the QAPI meeting held monthly.

An unhandled error has occurred. Reload 🗙