Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Lack of Remote Manual Stop Station for Generator

Wayne, New Jersey Survey Completed on 12-13-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure the Essential Electrical System (EES) was equipped with a remote manual stop station for the generator set, as required by NFPA 99: 2012 Edition and NFPA 110: 2010 Edition. During an observation on December 12, 2024, it was noted that the facility's generator, located outside the building, lacked a remote manual stop station. This deficiency was identified as having the potential to affect all residents. In an interview conducted on December 13, 2024, a staff member acknowledged awareness of the requirement for a remote manual stop station but was unable to locate one at the time. The absence of this critical safety feature was confirmed during the Life Safety Code Exit conference, highlighting a significant oversight in the facility's compliance with safety regulations.

Plan Of Correction

1/21/25 1. Corrective Actions Accomplished for residents found to have been affected by the deficient practice: Powerhouse Generators will be installing the remote manual stop on 1/21/25, due to the recent cold weather and freezing of the ground. Appointment confirmation attached. 2. Identification of residents who have the potential to be affected by the same deficient practice: All residents had the potential to be affected by the deficient practice. 3. Systemic changes to ensure that deficient practice does not recur: The U.S. FOIA (b) (6) was educated to maintain remote manual stop and electrical systems. The Maintenance Director/Designee will test remote manual stop during weekly generator testing. Findings will be submitted to the Administrator for review. 4. Monitoring corrective actions: Corrective actions will be evaluated for effectiveness, and the plan of corrections will be integrated into the Quality Assurance Performance Improvement (QAPI) program. The Quality Assurance Performance Improvement Committee will review the monthly audits on a Quarterly basis x 12 months to ensure compliance.